Tonga Cable System is a system connecting with, where it connects to other international networks. It is 827 kilometres (514 mi) long and was activated in 2013. It has at Sopu, a suburb of in, and, Fiji. The project was funded by and the. An extension of the cable to and was commissioned in April 2018.
The West Africa Cable System (WACS) is a linking with the along the west coast of Africa that was constructed by. The cable consists of four fibre pairs and is 14,530 km in length, linking from in the of South Africa to in the. It has 14, 12 along the western coast of Africa (includ.